IFS Cloud Project Governance: Five Questions to Answer

Five questions every IFS Cloud steering group asks, where the answers should come from, and how a register-based tool such as Implementer helps.

Independent IFS Cloud practice · Project governance Five questions a steering group asks, and where the answers should come from Key takeaways Every IFS Cloud steering group asks the same five questions about versions, approvals, readiness, updates and evidence. If the answer to one of them takes an afternoon, the…

Read more

Time Fences in IFS Cloud: Demand and Planning Time Fence

How the demand and planning time fences work in IFS Cloud: what each protects, who sets the values, and how master scheduling and MRP react.

Independent IFS Cloud practice · Planning design Know where the plan is frozen and where the system may still change it The planning time fence and the demand time fence in IFS Cloud divide the planning horizon into periods in which master scheduling and MRP treat supply and demand differently. A planner who expects…

Read more

Master Production Schedule Level 1 in IFS Cloud Explained

How Master Production Schedule Level 1 works in IFS Cloud: Level 0 and Level 1 parts, the proposals it creates, dependent demand and time fences.

Independent IFS Cloud practice · Master scheduling design Describe the Level 0 and Level 1 structure before planners read the proposals Master Production Schedule Level 1 is the level of the IFS Cloud master schedule where you plan long-term demand for parts that are manufactured or purchased. Its calculation creates…

Read more

IFS Cloud Intraday Availability: Supply and Demand Timing

How IFS Cloud analyses short-term supply and demand down to the minute: the horizon, firm or non-firm items, balance fields and projected quantity.

Independent IFS Cloud practice · Short-term planning Check projected stock down to the minute for the next days IFS Cloud intraday availability is the analysis of the short-term supply and demand situation for inventory parts, considering the timings within the day down to minute level. It runs on the Inventory Parts…

Read more

Master Scheduling ATP in IFS Cloud: How Promising Works

How Master Scheduling Available to Promise works in IFS Cloud: the master schedule as data source, generic and customer-dimension checks, and set-up.

Independent IFS Cloud practice · Order promising design Decide what the master schedule promises before customer orders depend on it Master Scheduling Available to Promise (ATP) is a promising method in IFS Cloud that uses the master schedule (MPS) as the data source for customer order promising. A promise date from…

Read more

IFS Cloud Material Requisition: Statuses, Reserve, Issue

How IFS Cloud material requisition works for internal demand: statuses, reservation before issue, partial issue and closing a line.

Independent IFS Cloud practice · Internal demand design Decide who reserves, who issues and who closes before requisitions pile up An IFS Cloud material requisition is the document through which material is requested for internal demand, and it runs through its own flow: request, reservation, issue and closure. If the…

Read more

IFS Cloud Routing Lead Time: Fixed, Variable and Overlap

How IFS Cloud routing lead time is calculated: fixed and variable time, standard lot size, parallel operations and overlap, with worked examples.

Independent IFS Cloud practice · Manufacturing planning design Check your routing data against the calculation that produces the planned lead time IFS Cloud routing lead time is the lead time of a manufactured part calculated from its routing, and the page states that MRP and Master Scheduling use it. If the…

Read more

IFS Cloud Email Customer Documents: Set-Up Rules

IFS Cloud email customer documents: how the contact is found, what each of invoice, quotation and order confirmation needs, and the invoice lock.

Independent IFS Cloud practice · Sales output design Check the contact, the document and the event before customers say they never got the invoice To make IFS Cloud email customer documents reach customers, each document needs its own set-up: an invoice, a quotation and an order confirmation each have their own page…

Read more

IFS Cloud Lead Time: Purchase, Manufacturing and Expected

IFS Cloud lead time: how purchase, manufacturing and expected lead time are defined, where each is calculated and which one MRP reads.

Independent IFS Cloud practice · Planning data design Know which lead time a function reads before you fill the fields IFS Cloud lead time lives in several fields, and each field has its own meaning. If purchase, manufacturing and expected lead time are filled without knowing which one a function reads, planned dates…

Read more
IFS Cloud project governance: five steering group questions

Independent IFS Cloud practice · Project governance

Five questions a steering group asks, and where the answers should come from

Key takeaways

  • Every IFS Cloud steering group asks the same five questions about versions, approvals, readiness, updates and evidence.
  • If the answer to one of them takes an afternoon, the fact it depends on has no owner, state or history of its own.
  • You can test this in 30 minutes on your own project, with no tool at all.
  • Implementer is the tool I built for the case where the test fails: each fact is a register row, and the documents are generated from the rows.

This is a method article first and a product article second. The method works on a spreadsheet if you are disciplined. The product exists because discipline across a whole project team does not last through a go-live.

1.Which five questions does every steering group ask?

Across implementations, rollouts and update cycles the questions repeat. What differs is how long the answer takes.

  1. Which version of the migration plan is current? Three copies and two owners give one deadline nobody can defend.
  2. Who approved this change, and when? The answer is somewhere in a mail thread.
  3. Are we really ready for go-live? Everyone has an opinion and nobody has the evidence next to the claim.
  4. Why did the update break our customisation again? Users found it, not a check.
  5. Where is the test evidence? In someone’s inbox, and an audit turns into archaeology.

A sixth problem sits underneath all five: the consultant who knew the reason left, and the reason was never written down.

2.How do you test your own project in 30 minutes?

Pick three of the five questions and answer each one with a document, a name, a date and a piece of evidence, using only what the project team can open without asking anyone.

  • It takes minutes and the evidence is attached: the fact is already managed.
  • It takes an afternoon or needs a phone call: the fact lives in a person, not in the project.
  • Two people give different answers: the fact has no single owner, and that is the gap to close first.

Close the gap that hurts most this quarter, not all of them. Start with the approval trail or the test evidence, because those are the two an auditor asks for.

3.What changes when each fact is a register row?

In Implementer a risk, a CRIM item, a change request, a baseline and a test result are rows, and every row has an owner, a state and a history. The 24 templates of the Implementation Docs Kit are not separate files. Each is generated on demand from the rows as a versioned PDF with a checksum, so the document for the steering group is never assembled by hand.

The same register behaves differently depending on the situation, so there are three modes:

  • New implementation: five gates with 61 checklist items, closed with evidence and acceptances by people.
  • Rollout: what is common to all sites stays common, and local differences are recorded separately.
  • BAU and Evergreen: IFS updates run as managed cycles with a regression pack and a drift check.

The individual registers are described in the Implementation Docs Kit series on www.ifs-erp.com, for example Change Requests and Change Control (IDK-07) and the Go-Live Readiness Decision (IDK-21), which covers the 42-criteria readiness review.

4.What will Implementer not do?

It reads IFS Cloud over OData with a read-only account, one account per environment, and never writes to IFS. It runs in your infrastructure, and users sign in with Microsoft Entra ID. The AI assistant is optional, switched on by an administrator, and it produces drafts only: nothing is approved until a person accepts it.

The live demo uses fictitious data of a company called Alfa Metal S.A. It does not show your data, your IFS or your Entra ID. Microsoft Teams notifications and the Microsoft 365 calendar have not been tested on a production tenant, so judge them in a pilot, not in the demo.

5.What do you see in the 15-minute demo?

The same path I use in a scoping call: the dashboard and gates, the CRIM board and the reason shown when an action is blocked, one change followed through its audit trail, the steering group pack read from the registers, and then either the readiness review or an update cycle with the environment matrix.

Open the live demo Book a 30-minute scoping call

6.Frequently asked questions

Do I need Implementer to run the 30-minute test?

No. The test needs only the project team and the files they already have. Implementer is for the case where the test shows that the answers depend on people instead of on the project.

Does Implementer write to our IFS Cloud?

No. It reads over OData with a read-only account and has a separate account for each environment. Nothing is installed in IFS, so an IFS update has no Implementer object to break.

How does an engagement start?

With a 30-minute scoping call and the 15-minute demo, followed by a pilot at a fixed price in your infrastructure. Terms are on the product site, implementer.ifs-erp.com. Product details are on the Implementer page.

7.About the author

Dariusz Myśliwiec is an independent IFS Cloud consultant with 18 years on IFS, and the person who builds Implementer.

Independent product, not an IFS product or document. IFS is a registered trademark of IFS AB; this practice is not affiliated with IFS AB.

×
Need Expert Guidance?
We've helped hundreds of businesses succeed. Get a free consultation to discuss your project requirements.
Get Free Consultation
17Years Experience
50Implementations
PRINCE2Certified
100%Success Rate

ROI Calculator

Calculate your return on investment

Input Values

€
€
€

Results

Annual Savings
€ 0
Payback Period
0 months
ROI
0%
Monthly Savings
€ 0

Get Detailed Report

Enter your details to receive a detailed ROI report.